Timor Leste ENCAP: Nu-Laran Primary School

Nu-Laran Primary School, Dili

1st Grade Building; 2nd Grade Building; 3rd Grade Building; 4th Grade Building; 5th Grade Building; 6th Grade Building; Auditorium; East Bathroom and septic tank; West Bathroom, septic tank, and leach field; Exterior wall repairs; Concrete work (sidewalks and slabs)

PROJECT SCOPE Replace roof and renovate 438 square meter auditorium, including pouring a new concrete floor slab and installing a new steel and concrete stage.  Renovate six classroom buildings, two restrooms, a kitchen area and a teachers’ lounge.  Renovations of the buildings include: replacement of corrugated roofing on two classroom buildings, installation of security grills on all windows, and rolling steel doors at all classrooms. The repair of all stucco walls and columns inside and out (including the masonry fence surrounding the complex), installation of new ceilings (the existing buildings had no ceilings); and the installation of light fixtures, switches and outlets in the library and staff buildings. Finally, prep, prime and paint all interior & exterior walls of all buildings and the masonry fence. Work on the grounds included Installation of new concrete sidewalks; replacement of the entire concrete entrance slab; repairs to exterior masonry fence and front steel gate; and the installation of two new septic systems and one new leach field.

The front of Nu-Laran school prior to construction

1st Grade building before

1st Grade building during construction

2nd Grade building before

2nd Grade building during construction

3rd Grade building before

3rd Grade building during construction

4th Grade building before

4th Grade building during construction

5th Grade building before

5th Grade building during construction

6th Grade building before

6th Grade building during construction

Exterior of Auditorium before

Exterior of Auditorium during construction

Interior of Auditorium before

Interior of Auditorium during construction

East Bathroom during construction

East Bathroom during construction

Kitchen area before

Kitchen area during construction

West bathroom before

West bathroom during construction

Typical washing station before

Typical wash station during construction

Typical classroom before

Typical classroom after

Typical classroom before

Typical classroom after

Septic tank hole in the beginning

Framing installed to pour the concrete septic tank

Septic tank after concrete pour

Digging the leach field for the septic system

The original scope of work had a private contractor completing both bathrooms and the Auditorium. The contractor failed to live up to his contract, and left the site– leaving the work to the Seabees and other partners. The entire project was planned to be completed, with a ribbon cutting, during the Mercy visit. However, with the additional work, the Seabees were pressed to complete all the work prior to the start of school in the fall.

PERSONNEL: 20 FLY-IN  Seabees; 10 SAIL-IN SEABEES; 17 HOST NATION Volunteers; 37 ROYAL AUSTRALIAN ARMY ENGINEERS; 35 CIVILIAN AND MILITARY volunteers FROM THE MERCY

DURATION: 22 JUN – 21 SEPT 2010

MANDAYS EXPENDED: 3,000 + (work was ongoing)

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Categories

Follow

Get every new post delivered to your Inbox.